Commercial Rough-In Inspection
Commercial rough-in inspection checklist with DWV head test, water PSI drop test, slope and support checks, photos, and inspector sign-off. Free to start.
Use this template with your own crew
Start a free trial, open it in the builder, and send it to a technician today. No card required.
Start free trial →30 days free · no card · cancel yourself any time. No seat minimum.
Would rather ask a person first? Email us — a human answers.
What happens when it's submitted
- Email the report to the customerEmails a branded PDF
- Flag for office reviewFlags for review · Notifies the office
Commercial Rough-In Inspection, on a phone and as a PDF
Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.
What's on the form
All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.
Job info
- Customer / GCRequiredcustomer lookup
- Job site locationGPS stamp
- Building area / floor inspectedRequiredtext
- Permit numberRequiredtext
- StageRequireddropdown
Pressure tests
- DWV test methodRequireddropdown
- DWV test hold time (minutes)Requirednumber
- DWV test resultRequireddropdown
- Water piping test pressure (PSI)Requirednumber
- Water test hold time (minutes)Requirednumber
- Pressure at end of hold (PSI)Requirednumber
- PSI dropcalculation
- Water test resultRequireddropdown
- Photo — test gauge on systemRequiredphoto
Workmanship checklist
- Drainage piping sloped min. 1/4" per foot (1/8" for 3"+ where allowed)Requireddropdown
- Hangers and supports at code spacing for pipe materialRequireddropdown
- Nail plates installed where piping is within 1-1/4" of stud faceRequireddropdown
- Sleeves and firestopping at rated penetrationsRequireddropdown
- Cleanouts installed at required intervals and accessibleRequireddropdown
- Dielectric isolation between dissimilar metalsdropdown
- Vent terminations and grade correctRequireddropdown
- Deficiencies found — locations and corrections neededtextarea
- Photo — deficienciesphoto
Result & sign-off
- Rough-in inspection resultRequireddropdown
- Re-inspection dateConditionaldate
- Plumber signatureRequiredsignature
- Site superintendent signaturesignature
Use this template with your own crew
Start a free trial, open it in the builder, and send it to a technician today. No card required.
Start free trial →30 days free · no card · cancel yourself any time. No seat minimum.
Would rather ask a person first? Email us — a human answers.