Field Wizard
← All templates
Plumbing

Commercial Rough-In Inspection

Commercial rough-in inspection checklist with DWV head test, water PSI drop test, slope and support checks, photos, and inspector sign-off. Free to start.

27 fields across 4 pages ~15 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Commercial Rough-In Inspection, on a phone and as a PDF

On the technician's phone. All 4 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGOCommercial Rough-In InspectionService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSCustomer / GCNorthside Property Gr…Job site location41.8781, -87.6298Building area / floor inspect…—Permit number—StageUnderground / under-s…PHOTO — TEST GAUGE ON SYSTEMPhoto 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Job info

  • Customer / GCRequiredcustomer lookup
  • Job site locationGPS stamp
  • Building area / floor inspectedRequiredtext
  • Permit numberRequiredtext
  • StageRequireddropdown
2

Pressure tests

  • DWV test methodRequireddropdown
  • DWV test hold time (minutes)Requirednumber
  • DWV test resultRequireddropdown
  • Water piping test pressure (PSI)Requirednumber
  • Water test hold time (minutes)Requirednumber
  • Pressure at end of hold (PSI)Requirednumber
  • PSI dropcalculation
  • Water test resultRequireddropdown
  • Photo — test gauge on systemRequiredphoto
3

Workmanship checklist

  • Drainage piping sloped min. 1/4" per foot (1/8" for 3"+ where allowed)Requireddropdown
  • Hangers and supports at code spacing for pipe materialRequireddropdown
  • Nail plates installed where piping is within 1-1/4" of stud faceRequireddropdown
  • Sleeves and firestopping at rated penetrationsRequireddropdown
  • Cleanouts installed at required intervals and accessibleRequireddropdown
  • Dielectric isolation between dissimilar metalsdropdown
  • Vent terminations and grade correctRequireddropdown
  • Deficiencies found — locations and corrections neededtextarea
  • Photo — deficienciesphoto
4

Result & sign-off

  • Rough-in inspection resultRequireddropdown
  • Re-inspection dateConditionaldate
  • Plumber signatureRequiredsignature
  • Site superintendent signaturesignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.