Field Wizard
← All templates
Oil & Gas

Daily Drilling Report

A mobile daily drilling report for rig supervisors: depth and footage, mud properties, bit performance, NPT coding, and daily cost. Works offline at the wellsite, emails a PDF morning report. Free to start.

39 fields across 5 pages ~15 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Daily Drilling Report, on a phone and as a PDF

On the technician's phone. All 4 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGODaily Drilling ReportService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSOperator / customerNorthside Property Gr…Well name & number—API / UWI number—Rig—Report date10 Aug 2026NON-PRODUCTIVE TIMECATEGORYHOURSWHAT HAPPENEDRig equipment12No deficienc…Rig equipment24No deficienc…Rig equipment36No deficienc…RIG FLOOR / LOCATION PHOTOSPhoto 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Well & tour

  • Operator / customerRequiredcustomer lookup
  • Well name & numberRequiredtext
  • API / UWI numbertext
  • RigRequiredtext
  • Report dateRequireddate
  • TourRequireddropdown
  • Company representativeRequiredemployee lookup
  • Wellsite locationGPS stamp
  • Hole sectionRequireddropdown
2

Depth & progress

  • Depth at start of tour (ft)Requirednumber
  • Depth at end of tour (ft)Requirednumber
  • Footage drilled (ft)calculation
  • Rotating hoursnumber
  • Average ROP (ft/hr)number
  • Bit number in holetext
  • Bit size (in)number
  • Weight on bit (klbs)number
  • Rotary speed (RPM)number
  • Standpipe pressure (psi)number
  • Flow rate (gpm)number
3

Mud & hole condition

  • Mud systemRequireddropdown
  • Mud weight (ppg)Requirednumber
  • Funnel viscosity (sec/qt)number
  • Fluid loss / API filtrate (mL/30min)number
  • Mud pHnumber
  • Losses or gains observedRequiredtoggle
  • Losses / gains detailConditionaltextarea
  • Background gas (units)number
  • Hole conditionRequireddropdown
4

Operations & time

  • Operations summary for the tourRequiredtextarea
  • Non-productive timerepeating section
  • Pre-tour safety meeting heldRequiredtoggle
  • Recordable incident, spill, or near miss todayRequiredtoggle
  • Incident detailConditionaltextarea
  • Rig floor / location photosphoto
5

Cost & sign-off

  • Daily cost ($)number
  • Cumulative well cost ($)number
  • Plan for next tourRequiredtextarea
  • Company representative signatureRequiredsignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.