Field Wizard
← All templates
Plumbing

Fixture Install Completion

Close out faucet, toilet, and disposal installs with a leak-tested completion record — photos, parts, signatures, and an automatic customer PDF. Free to start.

21 fields across 3 pages ~7 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Fixture Install Completion, on a phone and as a PDF

On the technician's phone. All 3 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGOFixture Install CompletionService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSCustomerNorthside Property Gr…Arrival location41.8781, -87.6298Fixture installedKitchen faucetMake / model installed—Fixture supplied byCompanyPARTS AND MATERIALS USEDPARTQTYUNITTOTALItem 112Item 1Item 1Item 224Item 2Item 2Item 336Item 3Item 3PHOTO — BEFOREPhoto 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Install details

  • CustomerRequiredcustomer lookup
  • Arrival locationGPS stamp
  • Fixture installedRequireddropdown
  • Make / model installedRequiredtext
  • Fixture supplied byRequireddropdown
  • Location in homeRequiredtext
  • Photo — beforephoto
2

Workmanship checklist

  • Angle stops / shutoff valvesRequireddropdown
  • New braided supply lines installedRequiredtoggle
  • P-trap and drain connections reset and aligneddropdown
  • New wax ring / seal set and bowl secured (toilets)dropdown
  • Fixture caulked / sealed where requireddropdown
  • Leak test — supply and drain under running waterRequireddropdown
  • Leak test failure — describe and correctRequiredConditionaltextarea
  • Photo — completed installRequiredphoto
3

Wrap-up & sign-off

  • Parts and materials usedparts picker
  • Work area cleaned, old fixture hauled awayRequiredtoggle
  • Customer walkthrough — operation demonstratedRequiredtoggle
  • Care / warranty notes for customertextarea
  • Technician signatureRequiredsignature
  • Customer signatureRequiredsignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.