Field Wizard
← All templates
Landscaping

Hardscape Install Daily Log

Paver install daily log with base depth, lift thickness, compaction passes, bedding, and production. Photo-documented, works offline. Free to start.

23 fields across 3 pages ~8 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Hardscape Install Daily Log, on a phone and as a PDF

On the technician's phone. All 3 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGOHardscape Install Daily LogService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSCustomer / projectNorthside Property Gr…Date10 Aug 2026ForemanD. ReyesCrew size72WeatherDryMATERIALS USED TODAYPARTQTYUNITTOTALItem 112Item 1Item 1Item 224Item 2Item 2Item 336Item 3Item 3PHOTO — END-OF-DAY PROGRESSPhoto 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Day & crew

  • Customer / projectcustomer lookup
  • DateRequireddate
  • ForemanRequiredemployee lookup
  • Crew sizeRequirednumber
  • WeatherRequireddropdown
  • Phase worked todayRequiredcheckbox
2

Base & compaction

  • Excavation depth below finish grade (in)number
  • Subgrade conditiondropdown
  • Geotextile fabric installedtoggle
  • Base materialdropdown
  • Lift thickness compacted (in)number
  • Compactor passes per liftnumber
  • Total compacted base depth to date (in)number
  • Bedding layerdropdown
3

Production & materials

  • Sq ft of pavers / block set todaynumber
  • Edge restraint installed and spikedtoggle
  • Polymeric sand swept and compactedtoggle
  • Materials used todayparts picker
  • Photo — end-of-day progressRequiredphoto
  • Delay or deviation from plantoggle
  • Delay / deviation detailConditionaltextarea
  • Plan for tomorrowtextarea
  • Foreman signatureRequiredsignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.