Pre-Drywall Inspection

Pre-drywall walkthrough checklist for builders: framing, rough-ins, insulation, and blocking with photos and signatures on mobile, offline-ready, instant PDF. Free to start.

26 fields across 4 pages ~25 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Pre-Drywall Inspection, on a phone and as a PDF

On the technician's phone. All 4 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGOPre-Drywall InspectionService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSCustomer / LotNorthside Property Gr…Property addressUnit 4BInspection date10 Aug 2026Inspected byD. ReyesArrival location41.8781, -87.6298DEFICIENCIES FOUNDLOCATION / R…DESCRIPTIONRESPONSIBLE…PHOTOItem 1No deficienc…Item 1CompletedItem 2No deficienc…Item 2CompletedItem 3No deficienc…Item 3CompletedSIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Property

  • Customer / LotRequiredcustomer lookup
  • Property addressaccount field
  • Inspection dateRequireddate
  • Inspected byRequiredemployee lookup
  • Arrival locationGPS stamp
  • Plan / elevationtext
2

Framing & Rough-ins

  • Framing
  • Framing plumb, square, and per planRequireddropdown
  • Headers, beams, and point loads correctRequireddropdown
  • Blocking for cabinets, rails, and fixtures installedRequireddropdown
  • Fireblocking and draftstopping completeRequireddropdown
  • Rough-ins
  • Plumbing rough-in complete, tested, protected with nail platesRequireddropdown
  • Electrical rough-in complete, boxes set at correct heightsRequireddropdown
  • HVAC ducts sealed and registers per planRequireddropdown
  • Low-voltage / data pre-wire completeRequireddropdown
3

Envelope & Insulation

  • Windows/doors installed, flashed, and foamedRequireddropdown
  • House wrap / WRB lapped and taped correctlyRequireddropdown
  • Insulation grade-1 install, no gaps or compressionRequireddropdown
  • Air sealing at penetrations and top platesRequireddropdown
  • Deficiencies foundrepeating section
4

Result & Sign-off

  • Ready for drywallRequireddropdown
  • Corrections due byConditionaldate
  • Inspector notestextarea
  • Inspector signatureRequiredsignature
  • Homeowner signature (if walkthrough attended)signature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.