PV System Commissioning Report

Record string Voc/Isc, megger tests, rapid shutdown checks, and inverter startup in one mobile commissioning report with PDF export. Free to start.

23 fields across 3 pages ~35 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

PV System Commissioning Report, on a phone and as a PDF

On the technician's phone. All 3 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGOPV System Commissioning ReportService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSCustomerNorthside Property Gr…Arrival location41.8781, -87.6298System size (kW DC)72Module make/model—Module count72STRING MEASUREMENTSSTRING IDMODULES IN S…MEASURED VOC…EXPECTED VOC…Item 1121212Item 2242424Item 3363636ARRAY PHOTOPhoto 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

System

  • CustomerRequiredcustomer lookup
  • Arrival locationGPS stamp
  • System size (kW DC)Requirednumber
  • Module make/modelRequiredtext
  • Module countRequirednumber
  • Inverter make/modelRequiredtext
  • Inverter architectureRequireddropdown
  • Irradiance at test (W/m²)number
2

String tests

  • Test each string with the array isolated. Compare Voc against the temperature-corrected expected value.instructions
  • String measurementsrepeating section
  • Insulation resistance (megger) test performedRequiredtoggle
  • Lowest IR reading (MΩ)Conditionalnumber
  • DC and AC terminations torqued and markedRequiredtoggle
3

Safety & startup

  • Rapid shutdown verificationRequireddropdown
  • Equipment grounding and lugs continuousRequiredtoggle
  • Placards and labels installed per NEC 690/705Requiredtoggle
  • Inverter startupRequireddropdown
  • AC output at startup (kW)number
  • Fault codes / notesConditionaltextarea
  • Monitoring portal online and customer invitedRequiredtoggle
  • Array photoRequiredphoto
  • Inverter / BOS wall photoRequiredphoto
  • Commissioning technician signatureRequiredsignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.