Rig Move Checklist

A rig move checklist for rig-down, transport and rig-up: route permits, load securement, power-line clearance, location readiness and sign-off — mobile and offline. Free to start.

32 fields across 4 pages ~20 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Rig Move Checklist, on a phone and as a PDF

On the technician's phone. All 4 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGORig Move ChecklistService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSOperator / customerNorthside Property Gr…Rig name / number—Move date10 Aug 2026Move coordinatorD. ReyesFrom location—LOADSLOAD / EQUIP…CARRIER / DR…SECUREMENT V…WITHIN PERMI…Item 1Item 1YesYesItem 2Item 2YesYesItem 3Item 3YesYesPHOTOS OF THE LOCATION ON DEPARTU…Photo 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Move detail

  • Operator / customerRequiredcustomer lookup
  • Rig name / numberRequiredtext
  • Move dateRequireddate
  • Move coordinatorRequiredemployee lookup
  • From locationRequiredtext
  • To locationRequiredtext
  • Destination location stampGPS stamp
  • Loads plannednumber
  • Route distance (miles)number
2

Permits & route

  • Before the first load rollsinstructions
  • Oversize / overweight permits in handRequireddropdown
  • Route surveyed for bridges, grades and turnsRequiredtoggle
  • Overhead power-line clearance confirmedRequiredtoggle
  • Utility locates called and marked at destinationRequiredtoggle
  • Pilot cars / escorts arrangedRequireddropdown
  • Road conditionsRequireddropdown
  • Landowner / surface owner notifiedtoggle
3

Rig down & securement

  • Well secured and BOP handled per procedureRequiredtoggle
  • All energy sources isolated and taggedRequiredtoggle
  • Lines and tanks drained, hazardous fluids containedRequiredtoggle
  • Loadsrepeating section
  • Loose items removed from decks and racksRequiredtoggle
  • Photos of the location on departurephoto
4

Rig up & sign-off

  • Destination pad level, compacted and drainedRequireddropdown
  • Pad deficienciesConditionaltextarea
  • Anchors installed and pull-testedRequireddropdown
  • Equipment spotted per location planRequiredtoggle
  • Mast raised with exclusion zone enforcedtoggle
  • Incidents, damage, or near misses during the moveRequiredtoggle
  • Incident detailConditionaltextarea
  • Move coordinator signatureRequiredsignature
  • Operator representative signaturesignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.