Substantial Completion Inspection

Substantial completion inspection form for commercial GCs. Verify systems, life safety and closeout deliverables, then capture signatures and a PDF record. Free to start.

24 fields across 4 pages ~25 min to complete Works offline

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.

What happens when it's submitted

Substantial Completion Inspection, on a phone and as a PDF

On the technician's phone. All 4 screens, in order — tap to step through them. Photos, signatures and repeat rows are captured on the device, and it all works with no signal.
YOUR LOGOSubstantial Completion InspectionService ReportJOB #1042DATE10 Aug 2026CUSTOMERNorthside Prop…TECHNICIAND. ReyesINSPECTION DETAILSProject / ownerNorthside Property Gr…Project addressUnit 4BInspection date10 Aug 2026GC representativeD. ReyesInspection attendeesNo deficiencies noted…COMPLETED SPACE PHOTOSPhoto 1Photo 2Photo 3SIGN-OFFTechnician signature10 Aug 2026DateYour Company · (555) 010-4477 · yourcompany.comPage 1 of 1
The PDF your customer receives. Your logo and your layout, with repeat sections tabulated and photos laid out — emailed the moment it's submitted.

Both panels are drawn from this template's actual fields, so they change when the form does. Sample values shown; branding and layout are yours to change in the PDF designer.

What's on the form

All of this is customizable to your process. Delete the fields you don't need, add the ones you do — and every lookup is powered by your customer list and your own data.

1

Project

  • Project / ownerRequiredcustomer lookup
  • Project addressaccount field
  • Inspection dateRequireddate
  • GC representativeRequiredemployee lookup
  • Inspection attendeesRequiredtextarea
  • Contract scope inspectedRequiredtextarea
2

Building systems

  • Life safety systems (fire alarm, sprinkler, egress, exit signage)Requireddropdown
  • Life safety deficienciesConditionaltextarea
  • HVAC operational and balancedRequireddropdown
  • Electrical complete with panels labeledRequireddropdown
  • Plumbing fixtures operationalRequireddropdown
  • Interior finishes completeRequireddropdown
  • Systems notestextarea
  • Certificate of occupancy statusRequireddropdown
3

Punch & closeout

  • Outstanding punch items remaining?Requireddropdown
  • Summary of remaining punch work and completion dateConditionaltextarea
  • Closeout deliverables receivedRequiredcheckbox
  • Closeout items outstandingtextarea
  • Completed space photosRequiredphoto
4

Determination & signatures

  • DeterminationRequireddropdown
  • Date of substantial completionConditionaldate
  • Items preventing substantial completionConditionaltextarea
  • GC representative signatureRequiredsignature
  • Owner / architect representative signatureRequiredsignature

Use this template with your own crew

Start a free trial, open it in the builder, and send it to a technician today. No card required.

Start free trial →

30 days free · no card · cancel yourself any time. No seat minimum.

Would rather ask a person first? Email us — a human answers.